EspritdeKzhrot’s diary

Pick up the interesting topics of naval security from the U.S. Department of Defense and U.S. Navy trend reports and so on. Also, I will make a note and follow on my ideas.

キニナル記事メモ2022/12/22

ちょっとキニナル記事、忘れないようリンクをメモします。


「宇宙安保構想」初策定へ 官民協力、産業育成を重視 関連防衛予算5倍・政府
https://news.yahoo.co.jp/articles/e23587f0d6515119c3b66da461f702ba7f951880

防衛装備協定に署名 日スウェーデン
https://news.yahoo.co.jp/articles/b9d453f41b5b9ecc853c0a1e451f9cc848026258

海自、イージス艦改修し運用 トマホーク、導入決定で
https://news.yahoo.co.jp/articles/f1400a751c2c499161442daa43e781f6668b2e25

地上発射型ミサイル改良に338億円、量産939億円 防衛費概要
https://news.yahoo.co.jp/articles/c3a5e0eeda9e64e210233dd207f5bc769d97bbb7

“弾薬だけ”で8200億円 来年度当初予算案、防衛費が25%増の過去最大 総額114兆円程度で最終調整
https://news.yahoo.co.jp/articles/86214c57d1ed325780b53c1d2d255b950bab7590

海保強化、「自衛隊と連携」明記 3文書改定で新方針
https://news.yahoo.co.jp/articles/176771f4dd97af1899aa54182c11a4147cd69454

首相、海保の予算増額と大型巡視船整備表明
https://news.yahoo.co.jp/articles/842019297d79f3ae69937cb572bbacbb32efbebc

 

National Security Strategy of Japan December, 2022

I was surprised by the way the National Strategy was written, which is a very different step from the wording of the second clause of the preface to the Japanese Constitution.

 

In the Constitution of Japan, "We trust in the justice and faith of peace-loving peoples." Hmmm.

 

The perception of the current situation as written in the National Strategy is entirely reasonable, and a certain number of objections are always likely to be biased opinions.

In other words, we are reminded that Japan has enjoyed the benefits of peace brought about by the post-World War II Cold War structure and the global economy in recent years.

 

Still, it is not appropriate to leave in place a resolution that could be said to violate the Constitution.
Does the government's urgency mean that the situation is that tense and that there is little time left?

Aside from the ideology that each side holds, a revision based on current factual perceptions is called for Constitution.

 

National Security Strategy of Japan
December, 2022

I Purpose
The international community is facing changes defining an era.
We are reminded once again that globalization and interdependence alone cannot serve as a guarantor for peace and development across the globe. The free, open, and stable international order, which expanded worldwide in the post-Cold War era, is now at stake with serious challenges amidst historical changes in power balances and intensifying geopolitical competitions.

 

In the preamble to the Constitution of Japan,
We, the Japanese people, desire peace for all time and are deeply conscious of the high ideals controlling human relationship, and we have determined to preserve our security and existence, trusting in the justice and faith of the peace-loving peoples of the world.

 

https://www.mod.go.jp/j/approach/agenda/guideline/index.html

キニナル報道を拾い読み

時節柄とはいえ、暇なのに時間がない日々を過ごしてなかなか報道に目を通せませんが、キニナル報道を拾い読み。

タイミングとして当然とも言えそうなPAC-3の話題。
他の武器もそうですが、これだけの引合いに見合う製造ができるとも思えないので、納期に注目です。

https://www.defensenews.com/flashpoints/ukraine/2022/12/13/us-poised-to-approve-patriot-missile-battery-for-ukraine/
US poised to approve Patriot missile battery for Ukraine

極超音速兵器に対応、「PAC3」に新型レーダー導入で調整…探知距離が数倍に
https://news.yahoo.co.jp/articles/ec5b769a4b16d010ea90ed6b5a51c4d3655d01af

 ちなみにミサイル調達価格実績などご参考。

 https://espritdekzhrot.hatenablog.com/
  UK - TOMAHAWK BLK IV TORPEDO LAUNCHED LAND-ATTACK MISSILES
  SWITZERLAND – PAC3 MSE MISSILES

 

DDG(X)プログラムの遅れは、FLTⅢの建造継続を意味すると思われるので、時間稼ぎの意味で海上自衛隊にとっては好都合ではと思われます。

https://www.defensenews.com/naval/2022/12/12/us-navy-secretary-sees-no-need-to-rush-next-gen-destroyer-program/
US Navy secretary sees no need to rush next-gen destroyer program
By Megan Eckstein

 

JSMやNSM、このくらいの射程のSSMの引合いも増えそう。

https://www.defensenews.com/industry/2022/11/23/kongsberg-precision-strike-missiles-to-replace-harpoons-on-uk-warships/
Kongsberg precision-strike missiles to replace Harpoons on UK warships

 

年末まで半月となったこの時期、防衛3文書?そろそろ各所説明の情報が報道に載ってきています。
予算とともに早期に公表が期待されます。

https://www.nikkei.com/article/DGXZQOUA09CDA0Z01C22A2000000/
海上自衛隊に「海上輸送総隊」創設防衛3文書に明記

地対艦ミサイル部隊増強 陸自2千人が海空へ安保3文書骨子案判明

 「反撃能力(敵基地攻撃能力)」に関しては、射程を1千キロ以上に延伸する12式地対艦ミサイルの部隊を現行の5個から7個に増強。
 航空自衛隊のみの無人機部隊は陸自と海自にもそれぞれ新設
 陸自の定員約2千人を海空に振り向け、総定員数は現行の24万7千人を維持 とか。

 「スタンド・オフ防衛能力」は、現行中期の約2千億円から約5兆円に増額
 「トマホーク」を念頭に取得。12式地対艦ミサイルを改良、艦艇、航空機、潜水艦からも。
 
 継戦能力は、部品不足が常態化し共食い整備を余儀なくされる状態を令和9年度までに解消
 
 燃料タンクを整備し、民間燃料タンクを借り上げ
 
 弾薬補充を急ぎ、陸自約90棟、海自約40棟の計130棟を新設。
 「不要弾薬の廃棄促進」も盛り込んだ。

 宇宙・サイバー・電磁波など「新たな領域」での戦いを強化するため、組織改編も進める。

 海自は護衛艦と機雷を除去する掃海艦を一元管理するため「水上艦艇部隊」に改編
 情報戦に関する能力を陸空自や海上保安庁と融合するため、「情報戦基幹部隊」を創設
 空自は「宇宙作戦群」を「宇宙作戦集団」に格上
 空自名称も「航空宇宙自衛隊」に改称
 情報収集するため無人機を導入、作戦情報団編成
 常設の統合司令部を創設
 サイバー防衛従事隊員を約2万人とし、専門部隊を約4千人に拡充 などなど 

UK - TOMAHAWK BLK IV TORPEDO LAUNCHED LAND-ATTACK MISSILES

ちなみに、トマホークはざっと2から3億円?($ 2m+くらい。)です。
さすがに米海軍の調達価格は低い(後述)ようですが、どのような経費が含まれているかにより価格は大きく変動するので、読み込まないと何とも言えません。
また、ブロックⅣ、タクティカルトマホーク及び近年のブロックⅤ、このあたりのコンフィグレーションもよくわかりません。
とはいえ、その戦略及び戦術的に実証された性能に対する価格は低い(コスパ大)といえると思います。

https://www.dsca.mil/press-media/major-arms-sales/united-kingdom-tomahawk-block-iv-torpedo-launched-land-attack-missiles

2014年にUKの調達では、65発の潜水艦発射型を $140 millionで。

UNITED KINGDOM - TOMAHAWK BLOCK IV TORPEDO LAUNCHED LAND-ATTACK MISSILES

WASHINGTON, Jul 1, 2014 - The State Department has made a determination approving a possible Foreign Military Sale to the United Kingdom for Tomahawk Block IV Torpedo Launched Land-Attack missiles and associated equipment, parts, training and logistical support for an estimated cost of $140 million. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale on July 1, 2014.

The United Kingdom (UK) has requested a possible sale of up to 65 Block IV All-Up-Round Torpedo Tube Launched Tomahawk Land-Attack Missiles, containers, engineering support, test equipment, operational flight test support, communications equipment, technical assistance, personnel training/equipment, spare and repair parts, and other related elements of logistics support. The estimated cost is $140 million.

ちなみに、 In 2016, the U.S. Department of Defense purchased 149 Tomahawk Block IV missiles for $202.3 million.
http://comptroller.defense.gov/Portals/45/documents/defbudget/FY2017/FY2017_Weapons.pdf#page=63

さらにFOTSはこのくらい。$368.53 million /2022

https://www.dsca.mil/press-media/major-arms-sales/united-kingdom-tomahawk-weapon-system-tws-follow-support
UNITED KINGDOM – TOMAHAWK WEAPON SYSTEM (TWS) FOLLOW-ON SUPPORT

WASHINGTON, March 29, 2022 - The State Department has made a determination approving a possible Foreign Military Sale to the Government of the United Kingdom of Tomahawk Weapon System (TWS) Follow-On Support and related equipment for an estimated cost of $368.53 million. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale today.

The Government of the United Kingdom (UK) has requested to buy follow-on support for all three segments of the United Kingdom’s Tomahawk Weapon System (TWS). This includes the All Up Round (AUR), Tactical Tomahawk Weapon Control System (TTWCS) and Theater Mission Planning Center (TMPC). The support includes recertification of the UK’s missiles; unscheduled missile maintenance; spares; procurement; training; in-service support; software; hardware; communication equipment; operational flight test; engineering and technical expertise to maintain the TWS capability; and other related elements of logistical and program support. The total estimated program cost is $368.53 million.

Tomahawk Block IV の解説はこちら。
https://en.wikipedia.org/wiki/Tomahawk_(missile)

 

SWITZERLAND – PAC3 MSE MISSILES

WASHINGTON, November 15, 2022 - The State Department has made a determination approving a possible Foreign Military Sale to the Government of Switzerland of PATRIOT Advanced Capability (PAC) 3 Missile Segment Enhanced (MSE) missiles and related equipment for an estimated cost of $700 million. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale today.

The Government of Switzerland has requested to buy up to seventy-two (72) PATRIOT Advanced Capability (PAC) 3 Missile Segment Enhanced (MSE) missiles. Also included are telemetry kits; PAC-3 MSE missile round trainers; PAC-3 MSE empty round trainers; PAC-3 missile skid kits; launcher stations heater controls; classified missile repair and return; classified PAC-3 concurrent spare parts; unclassified PAC-3 concurrent spare parts; PAC-3 MSE canister consumables; quality assurance; Field Surveillance Program; U.S. Government and contractor technical, engineering, and logistics technical assistance; flight test support; flight test targets; and other related elements of logistics and program support. The total estimated cost is $700 million.

https://www.dsca.mil/press-media/major-arms-sales/switzerland-patriot-advanced-capability-pac-3-missile-segment-enhanced

 

seventy-two (72) PATRIOT PAC3 MSE missiles を $700 millionで入手するのに、

ざっくり言えば1発あたり10ミリオン、ふーん10億円ねとおもったら、そうか今は円安で15億円、なかなかな価格ですね。

スイスもなかなかですが各国でも、PAC3を使用する場面では相当数のミサイルを短期に消耗すると思われるので、かなりな数の生産が必要ですね。

 

日本が調達するSM-6は、32発で450ミリオン。ざっと14ミリオン/発で20億円くらい。

The Government of Japan has requested to buy up to thirty-two (32) Standard Missile 6 (SM-6) Block I missiles (in two tranches of 16). Also included are MK 21 Vertical Launch System (VLS) canisters; obsolescence engineering, integration and test activity; canister handling equipment, spares, training and training equipment/aids; technical publications/data; U.S. Government and contractor engineering, technical and logistical support services; and other related elements of logistical and program support. The estimated total program cost is $450 million.

 

先日発射された、SM-3 ブロックⅡAは・・・。

こうなると、今話題のトマホークの価格や効果?が際立ちます。

そもそも用途が異なるし、イージス艦だけでなく潜水艦から垂直発射となると、トータルの運用コスト規模がどうなのかわかりませんが興味深いです。

 

www.defensenews.com

 

www.defensenews.com

 

www.dsca.mil

CRS Report of Navy Force Structure and Shipbuilding Plans

アメリカ経済のインフレ、さらには来年には大不況とかの話があるなど、将来予測がどれだけ意味を持つか怪しい気はしますが、
最新のCRSのNavy Force Structure and Shipbuilding Plans(October 20, 2022)の本紙通読は重いので、関連関のUSNI記事を読みます.

全人代を終えた中国、ウクライナ戦争、もめる英国など不安定な情勢の中で、米海軍がどれだけ急速に艦隊整備をできるか、
円安日本の海上自衛隊の艦隊整備にも影響があるものと思われます。

https://news.usni.org/2022/10/26/report-to-congress-on-navy-force-structure-and-shipbuilding-3
https://s3.documentcloud.org/documents/23195700/navy-force-structure-and-shipbuilding-plans-background-and-issues-for-congress-oct-20-2022.pdf

USNI記事では、

・2016 年 12 月、海軍は355 隻艦隊の目標を発表、2018 年度の国防権限法により政策化。
・355 隻の目標は古く、今後は大型艦船を減じ小型艦船を増やし、大型無人機 (UV))を含む艦隊へ。
・2022 年 4 月の、30 年間 (2023 から 2052 年度) の建造計画では、321 から 404 隻の有人艦艇、45 から 204 隻の大型 UV を有する艦隊を示す。
・2021 年 6 月の長期建造計画にはこれらが反映され、321 から 372 の有人艦艇と 77 から 140 の大型 UV を含む将来の海軍を概説。
また、30 年間建造計画には、3つの代替計画と戦力レベルの予測が含まれる。

 2023 年度予算案では、
バージニア (SSN-774) 級攻撃型潜水艦、2 隻
・アーリー バーク (DDG-51) 級駆逐艦、2 隻
・のコンステレーション (FFG-62) クラスのフリゲート艦、1 隻
・LPD-17 フライト II クラスの水陸両用船 1 隻、
・ジョン ルイス (TAO-205) 級の給油艦 1 隻、
・ナバホ (TATS-6) 級の曳航・救助・救助艦 1 隻。
・また、9 隻目の強襲揚陸艦 LHA-9が、議会が 2021年度に認めた艦船として、調達が要求されている。

・2023 年度予算には、9 隻の比較的新しい(LCS を含む 24 隻の退役も提案。

Japan Buy SM-6s in $450M

Japan Set to Buy SM-6s in Potential $450M Deal, Says State Department

 

https://www.dsca.mil/press-media/major-arms-sales/japan-standard-missile-6-block-i-sm-6-blk-i-missiles


https://news.usni.org/2022/10/20/japan-set-to-buy-sm-6s-in-potential-450m-deal-says-state-deptartment

 

Standard Missile 6 (SM-6) Block I missiles and related equipment を $450 millionで、
単純には1発あたり14mくらいであり、対空ミサイル(一部低層MDやサーフェス能力を有するとは言え、)としてはなかなかな金額。

この場合の費用対効果は、対象目標のイラン製ドローン?とかではなく、防護すべきものの価値で考えるものなのでしょう。

 

・thirty-two (32) Standard Missile 6 (SM-6) Block I missiles (in two tranches of 16).
・MK 21 Vertical Launch System (VLS) canisters
・Obsolescence engineering, integration and test activity.
・Canister handling equipment, spares, training and training equipment/aids.
・Technical publications/ data.
・U.S. Government and contractor engineering, technical and logistical support services.
・Other related elements of logistical and program support.

 

また、USNI記事には、SM-6 Missile Profileのきれいな絵が載っていますが、
SM-6 Unique / SM-2 Blk Ⅳ Unique は、同じセクションを指し、どう見ればよいのかわかりません。

 

文末のイージスシステム搭載艦についての記述は、時期的にも今回の調達分には含まれないのでは?と思われます。


Earlier this year, Japan indicated it would build two 20,000 warships designed specifically for ballistic missile defense missions, USNI News reported last month.